About: M4   Goto Sponge  NotDistinct  Permalink

An Entity of Type : owl:Thing, within Data Space : platform.yourdatastories.eu:8890 associated with source document(s)

The Line 4 is a new underground rapid transit line under construction in Milan, Italy, part of the Milan Metro system. The line was planned to be completed in 2015, as part of the works for the upcoming Milan Expo. However, delays in planning, financing and construction works forced to postpone the opening, and the line is now expected to open in 2022.The line will be 15 km (9.3 mi) long with 21 stations. The expected annual ridership is 87 million.

AttributesValues
rdfs:comment
  • The Line 4 is a new underground rapid transit line under construction in Milan, Italy, part of the Milan Metro system. The line was planned to be completed in 2015, as part of the works for the upcoming Milan Expo. However, delays in planning, financing and construction works forced to postpone the opening, and the line is now expected to open in 2022.The line will be 15 km (9.3 mi) long with 21 stations. The expected annual ridership is 87 million.
foaf:name
  • M4
foaf:depiction
  • External Image
is part of
line length (μ)
location
number of stations
opening year
operated by
status
  • under construction
thumbnail
type
Faceted Search & Find service v1.13.91 as of Nov 14 2017


Alternative Linked Data Documents: ODE     Content Formats:       RDF       ODATA       Microdata      About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data]
OpenLink Virtuoso version 07.20.3212 as of Mar 29 2016, on Linux (x86_64-unknown-linux-gnu), Single-Server Edition (68 GB total memory)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2026 OpenLink Software