About: Artvin Dam   Goto Sponge  NotDistinct  Permalink

An Entity of Type : owl:Thing, within Data Space : platform.yourdatastories.eu:8890 associated with source document(s)

The Arkun Dam an embankment dam currently under construction on the Çoruh River near İspir in Erzurum Province, Turkey. Construction began in 2011 and the primary purpose of the dam is hydroelectric power generation. It is part of the Çoruh Development Plan and its construction is being supervised by Turkey's State Hydraulic Works. The dam and power plant are expected to be complete in late 2015.

AttributesValues
rdfs:comment
  • The Arkun Dam an embankment dam currently under construction on the Çoruh River near İspir in Erzurum Province, Turkey. Construction began in 2011 and the primary purpose of the dam is hydroelectric power generation. It is part of the Çoruh Development Plan and its construction is being supervised by Turkey's State Hydraulic Works. The dam and power plant are expected to be complete in late 2015.
foaf:name
  • Artvin Dam
building start date
  • 2011
building start year
description
  • Embankment, earth-fill
vastest lake
location
opening year
owner
purpose
  • Power
river
status
  • UC
volume (μ³)
Faceted Search & Find service v1.13.91 as of Nov 14 2017


Alternative Linked Data Documents: ODE     Content Formats:       RDF       ODATA       Microdata      About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data]
OpenLink Virtuoso version 07.20.3212 as of Mar 29 2016, on Linux (x86_64-unknown-linux-gnu), Single-Server Edition (68 GB total memory)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2025 OpenLink Software