GO ALRT (Government of Ontario Advanced Light Rail Transit) was a light rail system proposed by GO Transit in 1982. The ARLT system would have been implemented along two new lines in the Greater Toronto Area. It would have used a new electric train to provide interurban service along the existing and new GO corridors. The system was based on an enlarged UTDC ICTS vehicle that was designed to offer a good compromise between passenger capacity and the level of infrastructure needed to support it.
| Attributes | Values |
|---|---|
| rdfs:comment |
|
| foaf:name |
|
| is part of | |
| line length (μ) |
|
| location | |
| number of stations |
|
| operated by | |
| owner | |
| passengers per day |
|
| railway rolling stock | |
| speed limit (kmh) |
|
| type |