The Southern Railway (SR) in the UK gave the designation SL to the fleet of AC overhead electric multiple units used on the South London Line between Victoria and London Bridge station. These had been built by the London, Brighton and South Coast Railway in 1909, but with the abandonment of the Elevated Electric service in 1928 they were converted to DC third rail units.
| Attributes | Values |
|---|---|
| rdfs:comment |
|
| foaf:name |
|
| foaf:depiction | |
| capacity |
|
| manufacturer | |
| number built |
|
| operator | |
| thumbnail | |
| year of construction |
|