About: dbpedia:Third_Don_Crossing   Goto Sponge  NotDistinct  Permalink

An Entity of Type : owl:Thing, within Data Space : platform.yourdatastories.eu:8890 associated with source document(s)

The 3rd Don Crossing/Third Don Crossing is being constructed by Balfour Beatty and is planned to open in February 2016. The single carriageway bridge is going to connect Gordon's Mills Road to the south and Fairview Street to the North. The bridge will allow traffic going from Danestone to Aberdeen's City Centre without having to go through the notorious Haudagain Roundabout or take a detour down the Parkway and along Ellon Road and King Street.

AttributesValues
rdfs:comment
  • The 3rd Don Crossing/Third Don Crossing is being constructed by Balfour Beatty and is planned to open in February 2016. The single carriageway bridge is going to connect Gordon's Mills Road to the south and Fairview Street to the North. The bridge will allow traffic going from Danestone to Aberdeen's City Centre without having to go through the notorious Haudagain Roundabout or take a detour down the Parkway and along Ellon Road and King Street.
builder
building end date
  • February 2016 (estimated)
building start date
  • October 2014
cost ($)
  • 1.8E7
crosses
located in area
maintained by
Faceted Search & Find service v1.13.91 as of Nov 14 2017


Alternative Linked Data Documents: ODE     Content Formats:       RDF       ODATA       Microdata      About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data]
OpenLink Virtuoso version 07.20.3212 as of Mar 29 2016, on Linux (x86_64-unknown-linux-gnu), Single-Server Edition (68 GB total memory)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2025 OpenLink Software