Uwada Dam is a gravity dam on the Tadami River 500 m (1,640 ft) downstream of Kaneyama in the Fukushima Prefecture of Japan. It was constructed between 1952 and 1954 for the purpose of hydroelectric power generation. It supplies a 63.9 MW power station with water.
| Attributes | Values |
|---|---|
| rdfs:comment |
|
| foaf:name |
|
| foaf:depiction | |
| building start date |
|
| building start year |
|
| country | |
| height (μ) |
|
| vastest lake | |
| length (μ) |
|
| location | |
| opening year |
|
| owner | |
| part | |
| river | |
| thumbnail | |
| volume (μ³) |
|