The Sherbino Wind Farm is located in Pecos County in west Texas. The first 150 megawatts (MW) of the project, which has a potential capacity of 750 MW, is in operation. Phase I utilizes 50 Vestas V-90 wind turbine generators, each with a rated capacity of 3 MW. BP will operate phase I of the project.Phase II, located on a 20,000-acre (8,100 ha) site 40 miles west of Fort Stockton, utilizes 60 Clipper Windpower C-96 wind turbines, each with a rated capacity of 2.5 MW.